2. Conceptual Design presentation & brainstorming meeting
Using the base plans created during the site measurement phase, we work out a design, then transfer it to our CAD system. Only one design option will be presented.
We have one meeting where we adjust the design according to your input. We trace over the design, noting whatever adjustments are agreed upon, then scan the traced plan back into the CAD system for use in creating the construction drawings.
1. First Step: Site Measurements for design
Once we've received an approved proposal, we normally measure the areas of your landscape to be redesigned, along with the exterior of your house. These measurements often include heights so we can determine drainage and steps.
This is the base plan used for this design, with elevation numbers for the front yard. Base plans are done in CAD (on a computer) for optimum accuracy. We use a transit to measure elevations & positions of objects - not just a tape measure.
Larger & more complicated sites require professional surveying.

3. Final drawings for bidding & construction
These plans contain virtually all the information needed by a contractor to bid and construct your new landscape. Typically, they include schematic drainage, layout, planting, lighting and construction details.
We do not typically do irrigation plans for residential projects. We found that contractors typically can do irrigation design themselves. Irrigation is often something that is modified by a contractor to lower the overall project cost.
All plans are 24" x 36".
The first drawing (top left) shows the hardscape with dimensions (concrete, decks, retaining walls, koi pond, etc.) and details of how the shade structure and walls will be built.
The second drawing (top right) shows the planting and lighting. It also has details on the construction of the koi pond. There is a plant legend listing the name, size and quantity of all proposed plants.
The third drawing shows how the plants and rocks should be installed, along with notes pertaining to the quality of the work, clean-up, and material information.